Fire-Rated Glazed Screens — Redhill and RH1

Our fire-rated glazed screens service covers Redhill and neighbouring areas such as Reigate and Horley, with every job built around a tested system.

E 30 – EI 120RH1England

Quote for Redhill

Tell us what you need. We reply with next steps and a guide price.

What our fire-rated glazed screens service includes in Redhill

A fire-rated glazed screen is an internal wall made largely of glass that forms part of a fire-resisting construction, such as a corridor wall, a stair enclosure or a compartment wall. It lets daylight and sightlines through while holding back fire for the period the fire strategy requires.

  • Handover evidence pack
  • Integrity or insulating glass to the required classification
  • Survey and setting-out against the fire strategy drawings
  • Integrated fire doors and glazed doorsets

What you can expect in Redhill

Honest about unknowns

If an existing frame in a Redhill building has no traceable evidence, we say so and price the options rather than guess.

Rated systems, not just rated glass

Every quote in Redhill identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.

England rules applied

Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.

Before you order fire-rated glazed screens: what matters

Doors inside a screen

A door in a glazed screen has to be tested in that configuration or covered by a doorset certificate and an assessment for the screen. We specify the door and screen as one system rather than mixing products.

Building control

New screens, and changes to existing fire-resisting walls, are normally building work. We provide the product evidence your building control body or approved inspector will ask for.

Movement and deflection

Long screens under slabs need deflection heads so floor movement does not crack the glass or open gaps. The head detail has to come from the same evidence as the rest of the screen.

Areas we cover around Redhill

Our Surrey coverage takes in Redhill (RH1, RH2) and the neighbouring towns of Reigate, Horley, Caterham. Redhill is about 28 km from Woking, the largest town in our Surrey coverage.

England regulations that shape the job

England Which rules apply?

Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.

Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.

In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.

Building types we cover in Redhill

Sector guides below cover schools and colleges, hotels and other buildings in Redhill.

FAQs for Redhill

How long does installation take?

Small screens are often fitted in a day once manufactured. Larger runs depend on site access and phasing; we agree a programme with you when we quote.

How large can a fire-rated glazed screen be?

It depends on the system's evidence. Most systems state maximum pane sizes and overall heights; very tall or wide screens may need an assessment from a test body. We confirm the limits during design.

Can you price fire-rated glazed screens in Redhill from photos?

We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.

Do you work on occupied buildings in Redhill?

Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.

Related

Related services in Redhill

Process

From enquiry to handover in Redhill

Tell us what you have

Send drawings, a fire risk assessment action or photos of the glass marks.

Site visit

A survey in Redhill confirms sizes, access, existing evidence and fixing conditions.

Written quote

You receive a written quote naming the tested system and classification.

Complete and document

Work is completed to the manufacturer's details and documented for your records.