Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
Nottinghamshire · NG5

Fire-Rated Glazed Screens for Arnold buildings

Fire-rated glazed screens in Arnold is usually needed for one of three reasons: new building work, a change to an existing fire-resisting wall, or defects found in an inspection. We handle all three.

E 30 – EI 120NG5England

Quote for Arnold

Tell us what you need. We reply with next steps and a guide price.

Fire-Rated Glazed Screens in Arnold: what's included

We design, supply and install fire-rated screens in steel, aluminium, timber and frameless formats, working from the rating and positions on your fire strategy. Every screen is built within the limits of its test or assessment evidence: pane sizes, transom and mullion spacing, glass type and the way it is fixed to the surrounding structure.

  • Fire-stopping at head, jambs and sill to the system details
  • Handover evidence pack
  • Integrity or insulating glass to the required classification
  • Survey and setting-out against the fire strategy drawings

Before you order fire-rated glazed screens: what matters

Doors inside a screen

A door in a glazed screen has to be tested in that configuration or covered by a doorset certificate and an assessment for the screen. We specify the door and screen as one system rather than mixing products.

Building control

New screens, and changes to existing fire-resisting walls, are normally building work. We provide the product evidence your building control body or approved inspector will ask for.

What the screen is fixed to matters

Test evidence covers the screen's connection to specific supporting constructions, such as masonry, concrete or a tested partition. Fixing into a lightweight wall that is not covered can undermine the rating, so we check the substrate first.

Areas we cover around Arnold

Whether the building is in central Arnold or the wider NG5, NG6, NG4 districts, we can survey and quote. We also cover Nottingham, Hucknall, West Bridgford. Arnold lies roughly 5 km from Nottingham, within our Nottinghamshire coverage.

What you can expect in Arnold

Honest about unknowns

If an existing frame in a Arnold building has no traceable evidence, we say so and price the options rather than guess.

Evidence you can file

You receive the classification references, glass marks and installation photographs for your fire safety records.

Rated systems, not just rated glass

Every quote in Arnold identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.

Which rules apply to fire-rated glazed screens in Arnold?

England Which rules apply?

Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.

Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.

Sectors we cover in Arnold

Fire-rated glazed screens applies to many building types in Arnold, including offices and hotels.

FAQs for Arnold

Can a fire-rated screen be fully glazed?

Yes. Many screens are glazed from floor to ceiling, subject to the classification needed on that route and any impact safety requirements at low level.

How large can a fire-rated glazed screen be?

It depends on the system's evidence. Most systems state maximum pane sizes and overall heights; very tall or wide screens may need an assessment from a test body. We confirm the limits during design.

How quickly can you survey in Arnold?

Survey timing in Arnold depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.

Do you work on occupied buildings in Arnold?

Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.

Related

Related services in Arnold

Process

What happens next

Start with the brief

Tell us the rating required, sizes and building type, or ask us to find out.

Survey

We visit Arnold to measure, record existing marks and check the frames and substrate.

Written proposal

We set out the system, glass, evidence and programme, with a fixed price.

Install and hand over

Installation to the system details, then a handover pack with photographs and evidence.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote