Steel Fire-Rated Screens
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →When a fire strategy, inspection report or building control comment in Stretford calls for glazing tested to resist fire, our fire-rated glazed screens service covers survey, supply and installation.
Tell us what you need. We reply with next steps and a guide price.
We design, supply and install fire-rated screens in steel, aluminium, timber and frameless formats, working from the rating and positions on your fire strategy. Every screen is built within the limits of its test or assessment evidence: pane sizes, transom and mullion spacing, glass type and the way it is fixed to the surrounding structure.
Fire glass can be combined with acoustic or security performance in many systems. We confirm the combined build-up is covered before pricing it.
Building guidance limits where integrity-only glazing can sit on protected escape routes, and in some positions restricts it to above a set height from the floor. Insulating screens are not restricted in the same way, so the route plan often decides the glass.
Test evidence covers the screen's connection to specific supporting constructions, such as masonry, concrete or a tested partition. Fixing into a lightweight wall that is not covered can undermine the rating, so we check the substrate first.
Survey visits can be arranged anywhere in Stretford, including the M32, M17, M33, M50, M41, M16 districts, and in nearby Old Trafford, Urmston, Sale. Manchester, around 6 km from Stretford, is the largest town in the same coverage area.
We can phase work in Stretford around residents, staff or pupils, with out-of-hours options.
You receive the classification references, glass marks and installation photographs for your fire safety records.
If an existing frame in a Stretford building has no traceable evidence, we say so and price the options rather than guess.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Sector guides below cover offices, industrial units and other buildings in Stretford.
Small screens are often fitted in a day once manufactured. Larger runs depend on site access and phasing; we agree a programme with you when we quote.
Yes. Many screens are glazed from floor to ceiling, subject to the classification needed on that route and any impact safety requirements at low level.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Building work in Stretford follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Hardwood screens and borrowed lights tested for fire.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We visit Stretford to measure, record existing marks and check the frames and substrate.
You receive a written quote naming the tested system and classification.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.