Steel Fire-Rated Screens
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →For Dukinfield buildings, we supply, replace and check fire-rated glazed screens wherever the fire strategy depends on it, working to the tested system rather than the glass alone.
Tell us what you need. We reply with next steps and a guide price.
We design, supply and install fire-rated screens in steel, aluminium, timber and frameless formats, working from the rating and positions on your fire strategy. Every screen is built within the limits of its test or assessment evidence: pane sizes, transom and mullion spacing, glass type and the way it is fixed to the surrounding structure.
You receive the classification references, glass marks and installation photographs for your fire safety records.
We can phase work in Dukinfield around residents, staff or pupils, with out-of-hours options.
Every quote in Dukinfield identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Building guidance limits where integrity-only glazing can sit on protected escape routes, and in some positions restricts it to above a set height from the floor. Insulating screens are not restricted in the same way, so the route plan often decides the glass.
Test evidence covers the screen's connection to specific supporting constructions, such as masonry, concrete or a tested partition. Fixing into a lightweight wall that is not covered can undermine the rating, so we check the substrate first.
Fire glass can be combined with acoustic or security performance in many systems. We confirm the combined build-up is covered before pricing it.
Coverage around Dukinfield includes the SK16, OL7, OL6, SK15, M34, SK14 districts and nearby Ashton-under-Lyne, Stalybridge, Hyde. Dukinfield is about 10 km from Manchester, the largest town in our Greater Manchester coverage.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Fire-rated glazed screens applies to many building types in Dukinfield, including public buildings and industrial units.
Yes. Many screens are glazed from floor to ceiling, subject to the classification needed on that route and any impact safety requirements at low level.
Yes. We plan dust control, out-of-hours working and temporary protection so the building can stay in use where the fire strategy allows.
Building work in Dukinfield follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We survey and install in Dukinfield and across Greater Manchester, including the SK16 district and nearby Ashton-under-Lyne.
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Hardwood screens and borrowed lights tested for fire.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
A survey in Dukinfield confirms sizes, access, existing evidence and fixing conditions.
We set out the system, glass, evidence and programme, with a fixed price.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.