Steel Fire-Rated Screens
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →We provide fire-rated glazed screens in Chalk Farm and across Greater London, working from the classification your building needs and handing over the evidence that proves what was fitted.
Tell us what you need. We reply with next steps and a guide price.
We design, supply and install fire-rated screens in steel, aluminium, timber and frameless formats, working from the rating and positions on your fire strategy. Every screen is built within the limits of its test or assessment evidence: pane sizes, transom and mullion spacing, glass type and the way it is fixed to the surrounding structure.
We cover Chalk Farm and the surrounding postcode districts, including NW3, NW5, NW1, NW1W, NW26, N7. Nearby towns we also serve include Camden Town, Holloway, Archway. Chalk Farm is one of the Greater London districts we cover.
New screens, and changes to existing fire-resisting walls, are normally building work. We provide the product evidence your building control body or approved inspector will ask for.
Test evidence covers the screen's connection to specific supporting constructions, such as masonry, concrete or a tested partition. Fixing into a lightweight wall that is not covered can undermine the rating, so we check the substrate first.
Long screens under slabs need deflection heads so floor movement does not crack the glass or open gaps. The head detail has to come from the same evidence as the rest of the screen.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
If an existing frame in a Chalk Farm building has no traceable evidence, we say so and price the options rather than guess.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
We can phase work in Chalk Farm around residents, staff or pupils, with out-of-hours options.
We can survey and quote for student accommodation, hotels and other building types in Chalk Farm.
It depends on the system's evidence. Most systems state maximum pane sizes and overall heights; very tall or wide screens may need an assessment from a test body. We confirm the limits during design.
They need periodic checks for damaged glass, missing beads, failed seals and unauthorised changes such as new cable holes. We can carry out these checks as part of a survey.
Building work in Chalk Farm follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We survey and install in Chalk Farm and across Greater London, including the NW3 district and nearby Camden Town.
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Hardwood screens and borrowed lights tested for fire.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We visit Chalk Farm to measure, record existing marks and check the frames and substrate.
We set out the system, glass, evidence and programme, with a fixed price.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.