Steel Fire-Rated Screens
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →From the TR7 district outwards, we arrange fire-rated glazed screens for buildings across Newquay, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
We design, supply and install fire-rated screens in steel, aluminium, timber and frameless formats, working from the rating and positions on your fire strategy. Every screen is built within the limits of its test or assessment evidence: pane sizes, transom and mullion spacing, glass type and the way it is fixed to the surrounding structure.
Test evidence covers the screen's connection to specific supporting constructions, such as masonry, concrete or a tested partition. Fixing into a lightweight wall that is not covered can undermine the rating, so we check the substrate first.
Fire glass can be combined with acoustic or security performance in many systems. We confirm the combined build-up is covered before pricing it.
Building guidance limits where integrity-only glazing can sit on protected escape routes, and in some positions restricts it to above a set height from the floor. Insulating screens are not restricted in the same way, so the route plan often decides the glass.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Coverage around Newquay includes the TR7, TR8 districts and nearby Truro, St Austell, Redruth. Truro, around 23 km from Newquay, is the largest town in the same coverage area.
After survey you get a fixed written quote for the agreed scope, so Newquay budgets are not open-ended.
We can phase work in Newquay around residents, staff or pupils, with out-of-hours options.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Sector guides below cover industrial units, offices and other buildings in Newquay.
Yes. Many screens are glazed from floor to ceiling, subject to the classification needed on that route and any impact safety requirements at low level.
It depends on the system's evidence. Most systems state maximum pane sizes and overall heights; very tall or wide screens may need an assessment from a test body. We confirm the limits during design.
Survey timing in Newquay depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Building work in Newquay follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Hardwood screens and borrowed lights tested for fire.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We visit Newquay to measure, record existing marks and check the frames and substrate.
You receive a written quote naming the tested system and classification.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.