Steel Fire-Rated Screens
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →From the CW9 district outwards, we arrange fire-rated glazed screens for buildings across Northwich, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
We design, supply and install fire-rated screens in steel, aluminium, timber and frameless formats, working from the rating and positions on your fire strategy. Every screen is built within the limits of its test or assessment evidence: pane sizes, transom and mullion spacing, glass type and the way it is fixed to the surrounding structure.
Building guidance limits where integrity-only glazing can sit on protected escape routes, and in some positions restricts it to above a set height from the floor. Insulating screens are not restricted in the same way, so the route plan often decides the glass.
New screens, and changes to existing fire-resisting walls, are normally building work. We provide the product evidence your building control body or approved inspector will ask for.
A door in a glazed screen has to be tested in that configuration or covered by a doorset certificate and an assessment for the screen. We specify the door and screen as one system rather than mixing products.
Whether the building is in central Northwich or the wider CW9, CW8 districts, we can survey and quote. We also cover Winsford, Warrington, Runcorn. Northwich is about 15 km from Warrington, the largest town in our Cheshire coverage.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Every quote in Northwich identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Fire-rated glazed screens applies to many building types in Northwich, including blocks of flats and offices.
Yes. Many screens are glazed from floor to ceiling, subject to the classification needed on that route and any impact safety requirements at low level.
They need periodic checks for damaged glass, missing beads, failed seals and unauthorised changes such as new cable holes. We can carry out these checks as part of a survey.
Survey timing in Northwich depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Building work in Northwich follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Hardwood screens and borrowed lights tested for fire.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We visit Northwich to measure, record existing marks and check the frames and substrate.
Your quote lists each item with its classification and the evidence it relies on.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.