Fire-Rated Glass Partitions
Office glass partitions where the wall has to be fire-resisting.
Learn more →Frameless fire-rated glazing in Rugeley is usually needed for one of three reasons: new building work, a change to an existing fire-resisting wall, or defects found in an inspection. We handle all three.
Tell us what you need. We reply with next steps and a guide price.
Frameless fire-rated glazing is a glass wall where panes meet edge to edge with a tested sealant joint instead of vertical frames, held in discreet head and base channels. It gives an almost uninterrupted view while still being tested to resist fire.
Survey visits can be arranged anywhere in Rugeley, including the WS15 districts, and in nearby Burntwood, Cannock, Lichfield. Rugeley is about 32 km from Stoke-on-Trent, the largest town in our Staffordshire coverage.
Channels at the head have to allow for slab movement without loading the glass.
Frameless glass is exposed during the build. We plan protection until other trades finish.
The sealant, joint width and any interlayer in the joint come from the test. Generic silicone in a fire glass joint is not acceptable.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
You receive the classification references, glass marks and installation photographs for your fire safety records.
After survey you get a fixed written quote for the agreed scope, so Rugeley budgets are not open-ended.
If an existing frame in a Rugeley building has no traceable evidence, we say so and price the options rather than guess.
Sector guides below cover industrial units, blocks of flats and other buildings in Rugeley.
Usually through a slim framed door set into the run, chosen so the combination is covered by evidence.
Yes, using tested butt-jointed systems, usually with insulating glass. It must be installed exactly to the tested details.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Building work in Rugeley follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Office glass partitions where the wall has to be fire-resisting.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We visit Rugeley to measure, record existing marks and check the frames and substrate.
You receive a written quote naming the tested system and classification.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.