Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
Staffordshire · ST16

Stafford fire-rated curtain walling

For Stafford buildings, we supply, replace and check fire-rated curtain walling wherever the fire strategy depends on it, working to the tested system rather than the glass alone.

E 30 – EI 60ST16England

Quote for Stafford

Tell us what you need. We reply with next steps and a guide price.

Fire-Rated Curtain Walling in Stafford: what's included

Fire-rated curtain walling is a glazed facade system tested to resist fire, used where an external wall has to stop fire spreading to a neighbouring building, between floors, or past a protected stair or lobby. It combines facade performance, such as weather tightness and thermal values, with a fire classification.

  • Handover evidence for the building record
  • Fire-rated zones within mixed facades
  • Slab-edge fire-stopping and cavity barriers to the design
  • Tested fire-rated curtain wall systems

Key checks for Stafford projects

Boundaries

External walls close to a boundary may need to be fire-resisting with limited unprotected areas. Fixed glazing that meets the wall's full fire-resistance requirement, including insulation where required, is not counted as unprotected area, so it can let you keep glass in those positions.

Higher-risk buildings

Work on higher-risk residential buildings in England goes through the Building Safety Regulator, which needs full product evidence at the design stage.

Slab edges

The gap between the curtain wall and each floor slab needs fire-stopping designed with the facade, not added afterwards.

England regulations that shape the job

England Which rules apply?

Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.

Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.

In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.

Where we work around Stafford

Whether the building is in central Stafford or the wider ST16, ST18 districts, we can survey and quote. We also cover Rugeley, Cannock, Burntwood. Stoke-on-Trent, around 23 km from Stafford, is the largest town in the same coverage area.

What you can expect in Stafford

Rated systems, not just rated glass

Every quote in Stafford identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.

Honest about unknowns

If an existing frame in a Stafford building has no traceable evidence, we say so and price the options rather than guess.

England rules applied

Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.

Sectors we cover in Stafford

We can survey and quote for offices, industrial units and other building types in Stafford.

Questions about fire-rated curtain walling in Stafford

Can you add fire-rated zones to existing curtain walling?

Sometimes, if the existing system has a tested fire-rated version. Otherwise a local replacement may be needed.

When does curtain walling need to be fire-rated?

Typically where the facade is near a boundary, where it encloses a protected stair or lobby, or where fire spread between floors has to be controlled. The fire strategy sets the requirement.

How quickly can you survey in Stafford?

Survey timing in Stafford depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.

Do you work on occupied buildings in Stafford?

Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.

Related

Related services in Stafford

E 30 – EI 60

Fire-Rated Windows

Windows near boundaries and protected routes, tested for fire.

Learn more →
E · EW · EI

Fire Glazing Surveys

Surveys that identify what fire glazing you have and what needs fixing.

Learn more →
Process

How a Stafford job runs

Share the details

Send the fire strategy extract, inspection report or a few photos of the openings.

Site visit

A survey in Stafford confirms sizes, access, existing evidence and fixing conditions.

Quote and evidence

Your quote lists each item with its classification and the evidence it relies on.

Fit and record

We install, photograph seals and fixings before closing up, and hand over the schedule.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote