Fire-Rated Glazed Screens
Internal glazed screens that keep compartments and corridors protected.
Learn more →If a building in Cheltenham needs aluminium fire-rated screens, the starting point is the rating its fire strategy requires. We confirm that, survey the openings and quote a tested system to suit.
Tell us what you need. We reply with next steps and a guide price.
Aluminium softens at a lower temperature than steel, so fire-rated aluminium systems rely on specific internal inserts, reinforcements and glazing details. We install only the tested system as a whole, in anodised or powder-coated finishes, with doors and side panels where the evidence allows.
Our Gloucestershire coverage takes in Cheltenham (GL50, GL51, GL52) and the neighbouring towns of Tewkesbury, Gloucester, Stroud. Cheltenham lies roughly 12 km from Gloucester, within our Gloucestershire coverage.
Head details and fixing centres come from the system documentation, especially beneath long-span slabs.
Some aluminium systems are tested for external facades, others for internal use only. We match the system to the position.
Aluminium systems are commonly available at 30 and 60 minutes; higher ratings are less common and may point to a steel system instead.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
After survey you get a fixed written quote for the agreed scope, so Cheltenham budgets are not open-ended.
If an existing frame in a Cheltenham building has no traceable evidence, we say so and price the options rather than guess.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Sector guides below cover healthcare buildings, schools and colleges and other buildings in Cheltenham.
Some systems are tested for external use. If the screen forms part of the building envelope we specify an external-rated system and glass.
Yes, when it is a system designed and tested for fire. Ordinary aluminium partitions and windows are not fire-rated, however thick the glass.
Building work in Cheltenham follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Survey timing in Cheltenham depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Internal glazed screens that keep compartments and corridors protected.
Learn more →Office glass partitions where the wall has to be fire-resisting.
Learn more →Facade glazing tested for fire where boundaries or compartments demand it.
Learn more →Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in Cheltenham and check what the existing frames can accept.
We set out the system, glass, evidence and programme, with a fixed price.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.