Fire Glazing Remedial Works
Putting right the defects found in surveys and fire risk assessments.
Learn more →Our fire glazing surveys service covers Trowbridge and neighbouring areas such as Bath and Frome, with every job built around a tested system.
Tell us what you need. We reply with next steps and a guide price.
Surveys help building owners, managing agents and those responsible for fire safety understand their compartmentation, prepare for building control scrutiny, and plan remedial budgets. We produce a clear schedule with photographs, priorities and costed remedial options.
We can phase work in Trowbridge around residents, staff or pupils, with out-of-hours options.
If an existing frame in a Trowbridge building has no traceable evidence, we say so and price the options rather than guess.
After survey you get a fixed written quote for the agreed scope, so Trowbridge budgets are not open-ended.
We can re-inspect after remedial work and update the schedule.
Unmarked or ordinary glass in fire-resisting walls, missing seals, painted-over intumescent strips, wrong beads and unsealed service holes are frequent findings.
In England, information about fire-resisting glazing forms part of the building's safety information. A survey helps build that record.
Our Wiltshire coverage takes in Trowbridge (BA14) and the neighbouring towns of Bath, Frome, Chippenham. Swindon, around 40 km from Trowbridge, is the largest town in the same coverage area.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
We can survey and quote for retail and leisure units, care homes and other building types in Trowbridge.
Yes. We provide costed remedial options and can carry out the work.
It depends on the number of glazed elements and access. Most single buildings are surveyed in a day or less.
Yes. We survey and install in Trowbridge and across Wiltshire, including the BA14 district and nearby Bath.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Putting right the defects found in surveys and fire risk assessments.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
A survey in Trowbridge confirms sizes, access, existing evidence and fixing conditions.
Your quote lists each item with its classification and the evidence it relies on.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.