Fire Glazing Remedial Works
Putting right the defects found in surveys and fire risk assessments.
Learn more →When a fire strategy, inspection report or building control comment in Aston calls for glazing tested to resist fire, our fire glazing surveys service covers survey, supply and installation.
Tell us what you need. We reply with next steps and a guide price.
Surveys help building owners, managing agents and those responsible for fire safety understand their compartmentation, prepare for building control scrutiny, and plan remedial budgets. We produce a clear schedule with photographs, priorities and costed remedial options.
We can re-inspect after remedial work and update the schedule.
Defects are graded so you can fix urgent items first and plan the rest.
Unmarked or ordinary glass in fire-resisting walls, missing seals, painted-over intumescent strips, wrong beads and unsealed service holes are frequent findings.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Survey visits can be arranged anywhere in Aston, including the B6, B7, B8, B42, B1, B12 districts, and in nearby Birmingham, Smethwick, Acocks Green. Aston is about 2 km from Birmingham, the largest town in our West Midlands coverage.
Every quote in Aston identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
You receive the classification references, glass marks and installation photographs for your fire safety records.
We can survey and quote for offices, public buildings and other building types in Aston.
It depends on the number of glazed elements and access. Most single buildings are surveyed in a day or less.
No. A fire risk assessment looks at the whole premises. A fire glazing survey looks in detail at the glazed elements of the compartmentation.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Putting right the defects found in surveys and fire risk assessments.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
A survey in Aston confirms sizes, access, existing evidence and fixing conditions.
We set out the system, glass, evidence and programme, with a fixed price.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.