Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
Scotland · 24 postcode districts

Lanarkshire fire glazing surveys

We take fire glazing surveys enquiries from across Lanarkshire, with surveys arranged in East Kilbride, Hamilton, Cumbernauld, Coatbridge, Airdrie and the surrounding towns.

E · EW · EIScotlandGML

Quote for Lanarkshire

Tell us what you need. We reply with next steps and a guide price.

Surveyor with a tablet and torch inspecting the frame edge of a glazed screen

Fire Glazing Surveys: an overview for Lanarkshire

Surveys help building owners, managing agents and those responsible for fire safety understand their compartmentation, prepare for building control scrutiny, and plan remedial budgets. We produce a clear schedule with photographs, priorities and costed remedial options.

  • Glass marks and classifications recorded
  • Defects prioritised by risk
  • Pane-by-pane schedule with locations

Before you order in Lanarkshire

Re-survey after works

We can re-inspect after remedial work and update the schedule.

Fire risk assessments

Surveys often follow a fire risk assessment action. We address the specific items raised.

Common findings

Unmarked or ordinary glass in fire-resisting walls, missing seals, painted-over intumescent strips, wrong beads and unsealed service holes are frequent findings.

Scotland rules for fire glazing

Scotland Which rules apply?

In Scotland, building work needs a building warrant under the Building (Scotland) Regulations 2004, with fire guidance in Section 2 of the Building Standards Technical Handbooks rather than Approved Documents.

For relevant premises, the Fire (Scotland) Act 2005 and the Fire Safety (Scotland) Regulations 2006 place duties on the duty holder to maintain fire safety measures, which include fire-resisting glazing.

Fire Glazing Surveys by town in Lanarkshire

Our Lanarkshire coverage spans 24 postcode districts across the G, ML postcode areas.

Questions from Lanarkshire clients

How long does a survey take?

It depends on the number of glazed elements and access. Most single buildings are surveyed in a day or less.

Do you fix what you find?

Yes. We provide costed remedial options and can carry out the work.

Is a survey the same as a fire risk assessment?

No. A fire risk assessment looks at the whole premises. A fire glazing survey looks in detail at the glazed elements of the compartmentation.

Can you survey anywhere in Lanarkshire?

Yes. We can arrange surveys anywhere in Lanarkshire, including East Kilbride and Hamilton, Cumbernauld, Coatbridge, Airdrie.

Related

Related services in Lanarkshire

Process

How a Lanarkshire job runs

Start with the brief

Tell us the rating required, sizes and building type, or ask us to find out.

Measure and check

We measure each opening in Lanarkshire and check what the existing frames can accept.

Quote and evidence

Your quote lists each item with its classification and the evidence it relies on.

Complete and document

Work is completed to the manufacturer's details and documented for your records.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote