Fire Glazing Remedial Works
Putting right the defects found in surveys and fire risk assessments.
Learn more →Our fire glazing surveys service covers Swanley and neighbouring areas such as Bexley and Dartford, with every job built around a tested system.
Tell us what you need. We reply with next steps and a guide price.
Surveys help building owners, managing agents and those responsible for fire safety understand their compartmentation, prepare for building control scrutiny, and plan remedial budgets. We produce a clear schedule with photographs, priorities and costed remedial options.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Every quote in Swanley identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
You receive the classification references, glass marks and installation photographs for your fire safety records.
In England, information about fire-resisting glazing forms part of the building's safety information. A survey helps build that record.
Surveys often follow a fire risk assessment action. We address the specific items raised.
We can re-inspect after remedial work and update the schedule.
Coverage around Swanley includes the BR8, DA4, BR5 districts and nearby Bexley, Dartford, Welling. Maidstone, around 28 km from Swanley, is the largest town in the same coverage area.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
We can survey and quote for schools and colleges, retail and leisure units and other building types in Swanley.
It depends on the number of glazed elements and access. Most single buildings are surveyed in a day or less.
It can confirm what is visible and recorded, and identify defects. Proving a rating may need manufacturer evidence or an assessment from a test body.
Building work in Swanley follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Putting right the defects found in surveys and fire risk assessments.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in Swanley and check what the existing frames can accept.
We set out the system, glass, evidence and programme, with a fixed price.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.