Fire Glazing Remedial Works
Putting right the defects found in surveys and fire risk assessments.
Learn more →For Bordon buildings, we supply, replace and check fire glazing surveys wherever the fire strategy depends on it, working to the tested system rather than the glass alone.
Tell us what you need. We reply with next steps and a guide price.
Surveys help building owners, managing agents and those responsible for fire safety understand their compartmentation, prepare for building control scrutiny, and plan remedial budgets. We produce a clear schedule with photographs, priorities and costed remedial options.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Every quote in Bordon identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
After survey you get a fixed written quote for the agreed scope, so Bordon budgets are not open-ended.
In England, information about fire-resisting glazing forms part of the building's safety information. A survey helps build that record.
A visual survey records marks, materials and visible defects. It cannot prove a frame's rating without evidence, so we flag unknowns clearly rather than guessing.
Defects are graded so you can fix urgent items first and plan the rest.
Coverage around Bordon includes the GU35 districts and nearby Farnham, Aldershot, Fleet. Bordon is about 44 km from Southampton, the largest town in our Hampshire coverage.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
We can survey and quote for hotels, retail and leisure units and other building types in Bordon.
Yes. We provide costed remedial options and can carry out the work.
It can confirm what is visible and recorded, and identify defects. Proving a rating may need manufacturer evidence or an assessment from a test body.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Yes. We survey and install in Bordon and across Hampshire, including the GU35 district and nearby Farnham.
Putting right the defects found in surveys and fire risk assessments.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
We visit Bordon to measure, record existing marks and check the frames and substrate.
Your quote lists each item with its classification and the evidence it relies on.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.