Fire Glazing Remedial Works
Putting right the defects found in surveys and fire risk assessments.
Learn more →Fire glazing surveys in Putney is usually needed for one of three reasons: new building work, a change to an existing fire-resisting wall, or defects found in an inspection. We handle all three.
Tell us what you need. We reply with next steps and a guide price.
Surveys help building owners, managing agents and those responsible for fire safety understand their compartmentation, prepare for building control scrutiny, and plan remedial budgets. We produce a clear schedule with photographs, priorities and costed remedial options.
Whether the building is in central Putney or the wider SW15, SW18, SW13, SW6, SW14, SW5 districts, we can survey and quote. We also cover Barnes, Fulham, Wimbledon. We cover Putney as part of our Greater London coverage.
Unmarked or ordinary glass in fire-resisting walls, missing seals, painted-over intumescent strips, wrong beads and unsealed service holes are frequent findings.
Surveys often follow a fire risk assessment action. We address the specific items raised.
We can re-inspect after remedial work and update the schedule.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
If an existing frame in a Putney building has no traceable evidence, we say so and price the options rather than guess.
We can phase work in Putney around residents, staff or pupils, with out-of-hours options.
After survey you get a fixed written quote for the agreed scope, so Putney budgets are not open-ended.
Fire glazing surveys applies to many building types in Putney, including blocks of flats and hotels.
It can confirm what is visible and recorded, and identify defects. Proving a rating may need manufacturer evidence or an assessment from a test body.
It depends on the number of glazed elements and access. Most single buildings are surveyed in a day or less.
Building work in Putney follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Survey timing in Putney depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Putting right the defects found in surveys and fire risk assessments.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We measure each opening in Putney and check what the existing frames can accept.
You receive a written quote naming the tested system and classification.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.