Fire Glazing Remedial Works
Putting right the defects found in surveys and fire risk assessments.
Learn more →For Poole buildings, we supply, replace and check fire glazing surveys wherever the fire strategy depends on it, working to the tested system rather than the glass alone.
Tell us what you need. We reply with next steps and a guide price.
A fire glazing survey is a non-destructive inspection of the glazed screens, doors, panels and windows in fire-resisting walls, recording what glass and frames are installed, whether they appear consistent with the required rating, and what defects need putting right.
Survey visits can be arranged anywhere in Poole, including the BH15, BH14, BH17, BH18, BH13 districts, and in nearby Bournemouth, Christchurch, New Milton. Bournemouth, around 7 km from Poole, is the largest town in the same coverage area.
A visual survey records marks, materials and visible defects. It cannot prove a frame's rating without evidence, so we flag unknowns clearly rather than guessing.
Unmarked or ordinary glass in fire-resisting walls, missing seals, painted-over intumescent strips, wrong beads and unsealed service holes are frequent findings.
Surveys often follow a fire risk assessment action. We address the specific items raised.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
You receive the classification references, glass marks and installation photographs for your fire safety records.
We can phase work in Poole around residents, staff or pupils, with out-of-hours options.
After survey you get a fixed written quote for the agreed scope, so Poole budgets are not open-ended.
Sector guides below cover hotels, schools and colleges and other buildings in Poole.
It depends on the number of glazed elements and access. Most single buildings are surveyed in a day or less.
No. A fire risk assessment looks at the whole premises. A fire glazing survey looks in detail at the glazed elements of the compartmentation.
Building work in Poole follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Putting right the defects found in surveys and fire risk assessments.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We visit Poole to measure, record existing marks and check the frames and substrate.
You receive a written quote naming the tested system and classification.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.