Fire Glazing Surveys
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →When a fire strategy, inspection report or building control comment in Rochdale calls for glazing tested to resist fire, our fire glazing remedial works service covers survey, supply and installation.
Tell us what you need. We reply with next steps and a guide price.
We work from fire risk assessments, fire door inspection reports and our own surveys, pricing each item clearly and completing the work with photographs and a schedule you can file. Where an item cannot be fixed without evidence from a manufacturer or test body, we say so and set out the options.
We plan remedial programmes around residents, pupils or staff, with phasing and clear communication.
Cables and pipes through glazed screens and their surrounds must be fire-stopped with products tested for that application.
Each completed item is photographed and cross-referenced to the original report so the action can be closed.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Whether the building is in central Rochdale or the wider OL16, OL12, OL11, OL15 districts, we can survey and quote. We also cover Heywood, Royton, Middleton. Manchester, around 16 km from Rochdale, is the largest town in the same coverage area.
We can phase work in Rochdale around residents, staff or pupils, with out-of-hours options.
If an existing frame in a Rochdale building has no traceable evidence, we say so and price the options rather than guess.
Every quote in Rochdale identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
We can survey and quote for healthcare buildings, retail and leisure units and other building types in Rochdale.
Yes. We prioritise by risk and agree phases with you.
Yes, before and after for every item, plus a completion schedule.
Survey timing in Rochdale depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Yes. We survey and install in Rochdale and across Greater Manchester, including the OL16 district and nearby Heywood.
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
A survey in Rochdale confirms sizes, access, existing evidence and fixing conditions.
You receive a written quote naming the tested system and classification.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.