Fire Glazing Surveys
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Our fire glazing remedial works service covers Hailsham and neighbouring areas such as Eastbourne and Seaford, with every job built around a tested system.
Tell us what you need. We reply with next steps and a guide price.
We work from fire risk assessments, fire door inspection reports and our own surveys, pricing each item clearly and completing the work with photographs and a schedule you can file. Where an item cannot be fixed without evidence from a manufacturer or test body, we say so and set out the options.
If an existing frame in a Hailsham building has no traceable evidence, we say so and price the options rather than guess.
After survey you get a fixed written quote for the agreed scope, so Hailsham budgets are not open-ended.
We can phase work in Hailsham around residents, staff or pupils, with out-of-hours options.
Remedial glass and seals must suit the existing frame's evidence. Where that evidence is missing, we raise it before work starts.
We plan remedial programmes around residents, pupils or staff, with phasing and clear communication.
We price each defect separately so you can approve urgent items first.
Our East Sussex coverage takes in Hailsham (BN27) and the neighbouring towns of Eastbourne, Seaford, Bexhill-on-Sea. Brighton, around 28 km from Hailsham, is the largest town in the same coverage area.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
We can survey and quote for offices, industrial units and other building types in Hailsham.
Yes, before and after for every item, plus a completion schedule.
Yes. Send the report and we will price the glazing-related actions item by item.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We visit Hailsham to measure, record existing marks and check the frames and substrate.
We set out the system, glass, evidence and programme, with a fixed price.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.