Fire Glazing Surveys
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →We provide fire glazing remedial works in High Wycombe and across Buckinghamshire, working from the classification your building needs and handing over the evidence that proves what was fitted.
Tell us what you need. We reply with next steps and a guide price.
We work from fire risk assessments, fire door inspection reports and our own surveys, pricing each item clearly and completing the work with photographs and a schedule you can file. Where an item cannot be fixed without evidence from a manufacturer or test body, we say so and set out the options.
We price each defect separately so you can approve urgent items first.
Cables and pipes through glazed screens and their surrounds must be fire-stopped with products tested for that application.
We plan remedial programmes around residents, pupils or staff, with phasing and clear communication.
Coverage around High Wycombe includes the HP13, HP11, HP12, HP15 districts and nearby Amersham, Maidenhead, Chesham. High Wycombe is about 46 km from Milton Keynes, the largest town in our Buckinghamshire coverage.
We can phase work in High Wycombe around residents, staff or pupils, with out-of-hours options.
After survey you get a fixed written quote for the agreed scope, so High Wycombe budgets are not open-ended.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Sector guides below cover public buildings, care homes and other buildings in High Wycombe.
We explain the options: obtaining evidence from the manufacturer, a formal assessment, or replacing the frame with a tested system.
Yes, before and after for every item, plus a completion schedule.
Survey timing in High Wycombe depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Yes. We survey and install in High Wycombe and across Buckinghamshire, including the HP13 district and nearby Amersham.
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in High Wycombe and check what the existing frames can accept.
Your quote lists each item with its classification and the evidence it relies on.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.