
Fire-Rated Curtain Walling
Facade glazing tested for fire where boundaries or compartments demand it.
Learn more →Gateways, change control and evidence for taller residential buildings in England.
In England, higher-risk buildings, broadly those at least 18 metres or seven storeys tall with at least two residential units, have the Building Safety Regulator as their building control authority. Glazing work that counts as building work in these buildings needs approval before it starts, with full product evidence, and changes must go through formal change control.
Design approval at Gateway 2 needs the fire glazing specification and evidence. Swapping products later is a controlled change, so specify tested systems early.
Building work in an existing higher-risk building also generally needs the Regulator's approval. Like-for-like repairs may be treated differently; check before assuming.
Information about fire-resisting glazing forms part of the building's safety information. Clear schedules and evidence references help duty holders keep it accurate.
Updated 09/10/2026. General guidance only; your fire strategy, designer and building control body decide what applies to a specific building.

Facade glazing tested for fire where boundaries or compartments demand it.
Learn more →
Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.